VRI

PROGRESS SO FAR

Adhesives Testing, Bonding, Safety Harness Testing


Checking bearing while machining rear carrier.JPG

Construction of the car rear view.JPG

CV joint tripod with hub.JPG

CV Tripod after first machine step.JPG

CV tripod with chain, sprocket, and differential.JPG

Differential housings new and old.JPG

Drivetrain Test Fit 2.JPG

Drivetrain test fit.JPG

Dry sump oil pan bottom.JPG

Engine in bare chassis with roll bar.JPG

Front Bulkhead Single 4 Inside 1 half.JPG

Front suspension upper view.JPG

Gears in new differential housing.JPG

Headers 1.JPG

Headers 2.JPG

Left carrier bracket 2.JPG

Left carrier bracket.JPG

Machining parts in the VF4.JPG

Machining rear bulkhead.JPG

Machining tripod.JPG

New differential housing next to old.JPG

Rear bulkhead during machining.JPG

Rear bulkhead in mill after facing.JPG

Rear corner full test fit.JPG

Rear drive mockup.JPG

Rear drivetrain mockup.JPG

Round stock for CV tripod housing in fixture.JPG

Shock with test spring.JPG

Sinusoidal spline on cv tripod.JPG

Some of V35 team.JPG

Steering rack center before assembly.JPG

Steering rack cut away view.JPG

Stock for CV tripod.JPG

Stub alxes in Titanium and Aluminum.JPG

Suspension Mockup.JPG

Test fit rear carrier mounts before bonding.JPG

Three stages of rear bulkhead 1.JPG

Top view of differential gears in new housing.JPG

Travis final fitting of chassis during bonding.JPG

Tripod housings with splines.JPG

Tripod with chain and sprocket.JPG

Upright on chassis.JPG

V35 Chassis.jpg

V35 Team Leaders.JPG

 

VRI Home